A large scale, full hazmat abatement prior to demolition on the Saskatchewan Hospital in North Battleford.
This project included abatement of: pipe insulation, plaster, drywall mud compound, vessel/ tank insulation, duct wrap, window caulking, duct mastic (gasket material), fireproofing, vinyl tile, vinyl sheet flooring, built up roofing, mastic/ adhesives (roofing), lay in ceiling tiles, mechanically fastened ceiling, transite board, stucco, vermiculite, texture coated ceiling, chalk board, ceramic tile thinset, stone lining, dire doors, boiler vessel and duct insulation, pipe fittings, lead sheething in walls, bell and spigot joinings, PCB ballasts, caulking, asbestos expansion joint, and glazing units.
Pinchin Ltd. and Bersch Consulting tested, monitored, and verified quantities of materials removed throughout the project. Covid 19 protocols set by the Government were strictly followed.
Along with Silverado Demolition, we have been working on this project since January 2021. The initial portion of this contract was completed in late April and additional abatement has continued since.
Watch for our drone footage of a 14,000 square foot roof area that we safely secured under negative pressure.
Lyle from Got Mold? came out to inspect our home for a mold issue we were having on our ceiling. He was extremely knowledgeable and took the time to carefully explain the cause of the mold as well as draw a diagram of what was causing the problem.
We had to have quite a major mold abatement job done on our basement and were very happy with the team at Got Mold from the initial inspection/testing all the way through the abatement work and cleanup.
I have a very high regard for this company. They gave prompt and superlative service! It was best anybody had done! Lyle from Got Mold? was calm and took immediate action when my kitchen had water leaking from somewhere.
Fill up the form and our Team will get back to you within 24 hours.
Fill up the form and our Team will get back to you within 24 hours.